Module 5 Quiz: Phase of Construction
Quiz Summary
0 of 9 Questions completed
Questions:
Information
You will not be able to take the quiz or exam until you select the agreement box and fill in your name.
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 9 Questions answered correctly
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
-
PASS: No. Try Again
-
PASS: YES. Congratulations!
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 9
1. Question
The goal of the ___________ is to complete the project in compliance with the contract documents’ requirements, applicable codes and regulations, and the contract documents’ sustainability goals, objectives, and requirements
CorrectIncorrect -
Question 2 of 9
2. Question
The contractor must install the materials using qualified craftspeople and implement a formal construction quality assurance (QA) program that establishes quality control requirements, means, and procedures (QC).
CorrectIncorrect -
Question 3 of 9
3. Question
The Quality Control program should be based on (Select all that apply):
CorrectIncorrect -
Question 4 of 9
4. Question
The following are checklist for sustainability except___________?
CorrectIncorrect -
Question 5 of 9
5. Question
_____________trainees should be given all of the information they need to operate and maintain the facility according to the owner’s specifications and maximize the project’s sustainability features in a reasonable amount of time.
CorrectIncorrect -
Question 6 of 9
6. Question
Prior to final acceptance, all punch list work must typically be done to the satisfaction of the owner, A/E, CM, and CxA.
CorrectIncorrect -
Question 7 of 9
7. Question
The contract documentation should specify the _________that must be met in order to meet the milestone for a project’s sustainability elements
CorrectIncorrect -
Question 8 of 9
8. Question
The CM or another designated party designs test procedures and acceptance criteria to ensure that equipment or systems satisfy performance objectives.
CorrectIncorrect -
Question 9 of 9
9. Question
An audit of sustainability criteria can be used to ensure that quality management systems are in place to meet the goals
CorrectIncorrect