Quiz 1 of 0
QUIZ: Module 2 – Formwork & Shoring Copy
Time limit: 0
Quiz Summary
0 of 6 Questions completed
Questions:
Information
Account:
You will not be able to take the quiz or exam until you select the agreement box and fill in your name.
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Quiz complete. Results are being recorded.
Results
0 of 6 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
-
PASS: No. Try Again
-
PASS: YES. Congratulations!
- 1
- 2
- 3
- 4
- 5
- 6
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 6
1. Question
The design of formwork must be in done by a:
CorrectIncorrect -
Question 2 of 6
2. Question
The Erection and Removal Plan and manufacturer’s specifications for fabricated shoring systems must be available at the job site during:
CorrectIncorrect -
Question 3 of 6
3. Question
Once erected, the shoring must be inspected by an engineer qualified in structural design
CorrectIncorrect -
Question 4 of 6
4. Question
When should erected shoring equipment be inspected? (Select all that apply)
CorrectIncorrect -
Question 5 of 6
5. Question
All nails used to secure bracing or adjustable timber single post shores must be driven home and the point of the nail bent over if possible.
CorrectIncorrect -
Question 6 of 6
6. Question
Forms and shores must not be removed until the person responsible for forming or shoring determines the concrete has enough strength to support its weight.
CorrectIncorrect